Our Projects

Driveway

This project was a new driveway and walkway.  The previous driveway was cracked and worn; in need of removal.  We hammered out the old driveway which was placed on pea gravel and had no rebar.  The pea gravel was removed.  New 3/4″ crushed gravel was installed and compacted.  Rebar was then installed on a 2′ grid pattern.  New concrete was then poured and broom finished.